PROJECT OVERVIEW

60 kW – Industrial Rooftop Solar Power Plant (Phase II)

Following the successful implementation of Phase I, 4M Solar delivered the second 60 kW phase of the industrial rooftop solar project for JSW at the Ennore Terminal in Chennai. The Phase II installation was designed to further expand the facility's renewable energy generation capacity and support its growing energy requirements with clean and reliable solar power.

The project was executed as a complete turnkey solar EPC solution, covering detailed site assessment, system engineering, procurement, rooftop structure installation, solar module deployment, electrical integration, testing, and commissioning. The system was carefully planned to integrate efficiently with the facility's existing electrical infrastructure.

With the successful completion of Phase II, the JSW Ennore Terminal achieved an additional 60 kW of solar capacity, bringing the combined capacity delivered across both phases to 120 kW. The expanded solar installation strengthens the facility's renewable energy infrastructure while contributing to reduced conventional electricity consumption and lower carbon emissions.

SCOPE OF WORK

  • Detailed site evaluation and planning for the Phase II solar installation
  • Engineering and design of the additional 60 kW grid-connected solar system
  • Supply and installation of high-performance solar PV modules and inverters
  • Rooftop mounting structure installation with accurate module positioning
  • DC/AC cabling, inverter integration, protection systems, and electrical connectivity
  • Testing, grid synchronization, commissioning, documentation, and client handover
Explore More ➜

SITE IMAGES

JSW Ennore Phase II 60 kW Industrial Solar Installation
60 kW Rooftop Solar Panel Installation at JSW Ennore Phase II
JSW Ennore Phase II Solar Inverter Installation
60 kW Solar Power Plant Commissioning at JSW Ennore

CONCLUSION

The Phase II 60 kW solar installation at JSW Ennore Terminal successfully expanded the site's renewable energy infrastructure and complemented the earlier Phase I installation. With both phases delivering a combined 120 kW capacity, the project demonstrates a scalable approach to industrial solar deployment while supporting cleaner energy generation, reduced grid dependency, and long-term energy efficiency.